10-Story Commercial Office Building

10-Story Commercial Office Building

East Florida
  • 450 Ton Cooling Capacity – CHW VAV System
  • 1,000,000 BTU Heating Capacity – Hydronic Heating System
  • Installed Complete Building Automation System
  • Installed Distech LonWorks Open Protocol Controllers
  • Installed Inet Web Based Graphical User Interface
  • Installed Inet Web Based Tennant Override/Billing System
  • Installed New 450 Ton SMARDT/Turbocor Chiller
  • Installed New Cooling Towers
  • Installed 4ea New 250,000 BTU Boilers
  • Installed VFDs on all Pumps and Fans
  • Converted all Mechanical Systems to Demand Based Variable Flow
  • Implemented Demand Based Optimization Energy Management Strategies
  • Reduced Total Energy Consumption by 43%
Aircraft Service Facility

Aircraft Service Facility

Orlando
  • 200 Ton Air Cooled DX – Temperature, Humidity, Flow & Pressure Control
  • Installed Complete Process Control System for Aircraft Paint Booths
  • Installed Distech BACnet Open Protocol Controllers
  • Installed Niagara AX Web Based Graphical User Interface
  • Installed Touch Screen Panel PC for Local User Interface
  • Dramatically Improved System Performance
  • Reduced Total Energy Consumption
Executive Airport

Executive Airport

Central Florida
  • 50 Ton Cooling Capacity – Air-Cooled DX VAV System
  • Installed Complete Building Automation System (HVAC & Lighting)
  • Installed Distech LonWorks Open Protocol Controllers
  • Installed Niagara AX Web Based Graphical User Interface
  • Installed New 50 Ton Condenser
  • Installed New 50 Ton Evaporator Coil
  • Implemented Demand Based Optimization Energy Management Strategies
  • Reduced Total Energy Consumption by 26% (24/7 Operation)
Elementary School

Elementary School

Central Florida
  • 220 Ton Cooling Capacity – Air-Cooled DX Under Floor VAV System
  • Installed Complete Building Automation System
  • Installed Distech LonWorks Open Protocol Controllers
  • Installed Niagara AX Web Based Graphical User Interface
  • Implemented Demand Based Optimization Energy Management Strategies
  • Reduced Total Energy Consumption by 34%
3-story Commercial Office Building

3-story Commercial Office Building

Central Florida
  • 70 Ton Cooling Capacity – Water Cooled DX VAV System
  • 1000 Ton Condenser Water Plant – Supplies Condenser Water to Several Surrounding Buildings
  • Installed Complete Building Automation System
  • Installed Distech LonWorks Open Protocol Controllers
  • Installed Niagara AX Web Based Graphical User Interface
  • Implemented Demand Based Optimization Energy Management Strategies
  • Reduced Total Energy Consumption by 44%
Retail Shopping Mall

Retail Shopping Mall

East Florida
  • 1750 Ton Cooling Capacity – CHW CV System
  • Installed Complete Building Automation System (HVAC & Lighting)
  • Installed Distech LonWorks Open Protocol Controllers
  • Installed Niagara AX Web Based Graphical User Interface
  • Integrated to Existing Trane Centrifugal Chiller (BACnet)
  • Integrated to Existing York Centrifugal Chillers (JCI N2)
  • Integrated to Existing Onicon BTU Meters (JCI N2)
  • Installed 3ea New 600 Ton Cooling Towers (1800 Tons)
  • Implemented Demand Based Optimization Energy Management Strategies
  • Reduced Total Energy Consumption by 25%
Large Campus Church

Large Campus Church

Central Florida
  • 750 Ton Cooling Capacity – OUC – CHW VAV System
  • Upgrade Existing Building Automation System
  • Completed Niagara AX Installation and Database
  • Programming After Previous Controls Contractor Failed to Perform Integration
  • Programmed Niagara AX Web Based Graphical User Interface
  • Integrated to Existing Invensys Controllers (Lonworks)
  • Installed Distech LonWorks Open Protocol Controllers
  • Implemented Demand Based Optimization Energy Management Strategies
  • Reduced Total Chilled Water Utility Usage & Eliminated Low Delta Penalty
Major Theme Park

Major Theme Park

Central Florida
  • Integration Service & Consulting (Process and HVAC Control)
  • Integrated to Existing Delta Controllers (BACnet)
  • Integrated to Existing ABB VFDs (BACnet)
  • Installed Distech BACnet Open Protocol Controllers
  • Installed Niagara AX Web Based Graphical User Interface
  • Installed 3ea Niagara AX JACE Network Controllers
  • BACnet Integration
  • MODbus Integration
  • Trane Legacy Protocol Integration
3-story Commercial Office Building

3-story Commercial Office Building

Central Florida
  • 140 Ton Cooling Capacity – Water Cooled DX VAV System
  • 750 Ton Condenser Water Plant – Supplies Condenser Water to Several Surrounding Buildings
  • Installed Complete Building Automation System
  • Installed Distech LonWorks Open Protocol Controllers
  • Installed Niagara AX Web Based Graphical User Interface
  • Implemented Demand Based Optimization Energy Management Strategies
  • Reduced Total Energy Consumption by 38%
90,000 sq-ft Commercial Office Building

90,000 sq-ft Commercial Office Building

West Florida
  • Air-Cooled DX CV System
  • Upgrade Existing Building Automation System
  • Installed Niagara AX Web Based Graphical User Interface
  • Integrated to Existing Johnson Controllers (JCI N2)
  • Installed Distech LonWorks Open Protocol Controllers
  • Implemented Energy Management Strategies Reduced Total Energy Consumption
Condominium

Condominium

East Florida

East Florida

  • Water Cooled DX CV System
  • Installed Condenser Water Plant Automation System
  • Installed Distech LonWorks Open Protocol Controllers
  • Installed Niagara AX Web Based Graphical User Interface
  • Integrated to ITT Variable Frequency Drives (MODbus)
  • Implemented Demand Based Optimization Energy Management Strategies
  • Reduced Total Energy Consumption
Meeting and Performance Venue

Meeting and Performance Venue

Central Florida
  • Air Cooled DX CV System
  • Installed Complete Building Automation System
  • Installed Distech LonWorks Open Protocol Controllers
  • Installed Honeywell LonWorks Open Protocol Controllers
  • Installed Niagara AX Web Based Graphical User Interface
  • Implemented Demand Based Optimization Energy Management Strategies
  • Reduced Total Energy Consumption